# Missing documents, clarification and correction of calculation errors

- URL: https://procurelex.hu/en/guides/missing-documents-and-clarification
- Updated 2026-11-17
- Draft – awaiting legal review
- Legal basis: Kbt. Section 71(1), Kbt. Section 71(2), Kbt. Section 71(3), Kbt. Section 71(4), Kbt. Section 71(5), Kbt. Section 71(6), Kbt. Section 71(8), Kbt. Section 71(9), Kbt. Section 71(10), Kbt. Section 71(11)

When a contracting authority must ask for missing documents or for clarification, what may and may not be supplied or changed that way, and how a calculation error is corrected under Section 71 of the Kbt.

Where a document is missing from a tender or a request to participate, or a statement in it is unclear, the contracting authority must give the economic operator the opportunity to supply what is missing or to clarify the content ([Kbt. Section 71(1)](https://procurelex.hu/en/kbt/71#p1)). Section 71 of the Public Procurement Act (Kbt.) provides three tools for this: the request for missing documents (hiánypótlás), the request for clarification (felvilágosítás kérés) and the correction of calculation errors (számítási hiba javítása). This guide explains when they must be used, what can and cannot be supplied or changed through them, and what happens when the tenderer does not comply or complies badly.

## An obligation, on equal terms for all

The contracting authority (ajánlatkérő) must give every [tenderer](https://procurelex.hu/en/glossary/tenderer) (ajánlattevő) and candidate (részvételre jelentkező) the opportunity to supply missing documents on the same terms, and must ask for clarification where the content of a statement, declaration or certificate in a tender or request to participate is unclear ([Kbt. Section 71(1)](https://procurelex.hu/en/kbt/71#p1)). If it finds a deficiency that was not in an earlier request, it must issue a further request ([Kbt. Section 71(6)](https://procurelex.hu/en/kbt/71#p6)).

The request is sent directly to the tenderer concerned, with simultaneous notice to the other tenderers or candidates. It must state the time limit and, in a request for missing documents, the deficiencies to be remedied ([Kbt. Section 71(2)](https://procurelex.hu/en/kbt/71#p2)); Section 71 does not fix the length of that time limit, which the contracting authority sets. Where a tender is submitted jointly, the request is sent to the joint tenderers' representative ([Kbt. Section 35(4)](https://procurelex.hu/en/kbt/35#p4)). As a rule, communication takes place in writing, by electronic means, in the [EKR](https://procurelex.hu/en/glossary/electronic-public-procurement-system), the electronic public procurement system ([Kbt. Section 40(1)](https://procurelex.hu/en/kbt/40#p1), [Kbt. Section 41(1)](https://procurelex.hu/en/kbt/41#p1)).

## What may be supplied

Supplying missing documents may serve only to bring the tender or request to participate into line with the procurement documents (közbeszerzési dokumentumok) or the law. Within that purpose the documents submitted may be amended and supplemented, including the certificates submitted later under Section 69(4)–(5) ([Kbt. Section 71(3)](https://procurelex.hu/en/kbt/71#p3)). Two limits always apply:

- supplying documents or clarification must not infringe the principles of Section 2(1)–(3) and (5), among them fair and transparent competition, equal opportunities and equal treatment, good faith and fair dealing, and national treatment ([Kbt. Section 71(8)(a)](https://procurelex.hu/en/kbt/71#p8-a));
- in a document of the tender on the characteristics of the subject-matter, the way the contract will be performed or other contract terms, only an error or omission on a minor, individual point of detail may be corrected or supplied; under a lump-sum contract an item of the priced bill of quantities (árazott költségvetés) and its unit price may also be supplied, amended, completed or deleted. All of this only if the change affects neither the total tender price or its evaluated sub-total nor the ranking of the tenderers in the evaluation ([Kbt. Section 71(8)(b)](https://procurelex.hu/en/kbt/71#p8-b)).

For the bid security (ajánlati biztosíték), missing documents may be supplied where the tenderer did not attach the proof of the security, or attached it in a form other than the one required, but the security was in fact provided as required, or the guarantee, the surety undertaking or the bond was issued before the tender became binding ([Kbt. Section 71(3a)](https://procurelex.hu/en/kbt/71#p3a)).

## Voluntary supply of missing documents

While a time limit for missing documents or clarification is running for any tenderer or candidate, any of them may remedy deficiencies it was not asked about. Where the request concerns the certificates submitted at the request under Section 69(4), or is made under Section 80(4) following pre-litigation dispute resolution (előzetes vitarendezés), only the tenderer that received the request may do so ([Kbt. Section 71(5)](https://procurelex.hu/en/kbt/71#p5)).

## Further requests and new economic operators

Section 71(6) allows one exception to the duty to issue a further request: where the tenderer, in supplying documents, brings in an economic operator that was not in its tender before, and a further request would be needed because of that operator, the contracting authority need not issue it, provided the procurement documents said that in such a case it would issue no further request, or only within limits it set. A deficiency already indicated cannot be remedied in a later round ([Kbt. Section 71(6)](https://procurelex.hu/en/kbt/71#p6)). In a procedure under Section 115 the contracting authority need not issue a further request, even without saying so in the documents, where it would be needed because of a document supplied or an economic operator newly named in the remedy ([Kbt. Section 115(6)](https://procurelex.hu/en/kbt/115#p6)).

## An excluded subcontractor or capacity provider

Where the contracting authority finds that a [subcontractor](https://procurelex.hu/en/glossary/subcontractor) named by the tenderer, or an entity on whose capacities the tenderer relies to meet the selection criteria, is subject to an exclusion ground of Section 62(1), or of Section 63 if the contracting authority applied it, it excludes that entity and, through a request for missing documents, asks the tenderer to name another one where needed ([Kbt. Section 71(4)](https://procurelex.hu/en/kbt/71#p4)). This does not apply where the tender is invalid under Section 73(1)(c): where the entity was excluded for false information or declarations, undue influence or an agreement distorting competition ([Kbt. Section 62(1)(i)](https://procurelex.hu/en/kbt/62#p1-i), [Kbt. Section 62(1)(j)](https://procurelex.hu/en/kbt/62#p1-j), [Kbt. Section 62(1)(o)](https://procurelex.hu/en/kbt/62#p1-o)), and the tenderer has not proved that it did not know, and with due care need not have known, of the ground (and, for an agreement distorting competition, that it did not affect its tender) ([Kbt. Section 73(1)(c)](https://procurelex.hu/en/kbt/73#p1-c)). The contracting authority gives the tenderer the opportunity to prove this through a request for clarification ([Kbt. Section 73(4)](https://procurelex.hu/en/kbt/73#p4)).

## Experts who are evaluated

Where the contracting authority evaluates the qualifications and experience of the staff assigned to perform the contract ([Kbt. Section 76(3)(b)](https://procurelex.hu/en/kbt/76#p3-b)), the person of a presented expert may change through the remedy only where another must be named because of an exclusion ground, or where it is needed to meet a selection criterion. The new expert must be at least equivalent to the previous one in every circumstance relevant to the evaluation; a more experienced or better qualified person does not improve the evaluation either, because the remedy then too serves only to make the tender valid ([Kbt. Section 71(9)](https://procurelex.hu/en/kbt/71#p9)).

Where the data on an expert in the reading sheet (felolvasólap) contradict the document attached on that expert, and the reading-sheet data cannot be supported through clarification or by supplying documents on the expert already presented, the tender is invalid ([Kbt. Section 71(9)(a)](https://procurelex.hu/en/kbt/71#p9-a)). Where the reading-sheet data are the less favourable, those data are used in the evaluation ([Kbt. Section 71(9)(b)](https://procurelex.hu/en/kbt/71#p9-b)). Where the contracting authority set the most favourable level of an element of the tender at which it already awards the maximum score, and it is clear despite a contradiction that the element earns the maximum score, the tender may not be declared invalid for that reason ([Kbt. Section 71(9a)](https://procurelex.hu/en/kbt/71#p9a)).

## Clarification: only to clarify

The contracting authority may ask for clarification only as Section 71(1)–(2) provides, and only for clarification needed to assess the tenders or requests to participate ([Kbt. Section 71(7)](https://procurelex.hu/en/kbt/71#p7)). Clarification resolves unclear content; the limits of Section 71(8) apply to it as well, so it cannot lead to a prohibited change of the tender ([Kbt. Section 71(8)](https://procurelex.hu/en/kbt/71#p8)).

## Correcting a calculation error

Where the contracting authority finds a calculation error that affects the evaluation, it asks the tenderer to correct it, stating the error, the value to be corrected and the value resulting from the correction. It determines the result by taking the itemised values of the elements of the subject-matter (the base data) and calculating from them the total consideration or other data based on a calculation in the tender. If the correction is not made, is late or is wrong, the tender is invalid ([Kbt. Section 71(11)](https://procurelex.hu/en/kbt/71#p11)).

## When the remedy fails or goes too far

The contracting authority must satisfy itself that what was supplied or clarified complies with Section 71. If it goes beyond the limits of Section 71(3) or (8)–(9), or was not supplied, or not in time, only the original tender or request to participate may be taken into account ([Kbt. Section 71(10)](https://procurelex.hu/en/kbt/71#p10)). If the original then does not meet the requirements, the tender is invalid on the ground that fits the deficiency, for instance because suitability was not properly proved ([Kbt. Section 73(1)(d)](https://procurelex.hu/en/kbt/73#p1-d)) or because it does not meet the technical specifications ([Kbt. Section 73(1)(k)](https://procurelex.hu/en/kbt/73#p1-k)).

A specific rule applies to the certificates requested at the end of the evaluation: if the best-ranked tenderer still does not submit the certificates on exclusion grounds and selection criteria properly after the remedy or clarification, the contracting authority disregards its tender and invites the next best-ranked tenderer ([Kbt. Section 69(5)](https://procurelex.hu/en/kbt/69#p5)); see the [guide on the ESPD and proof](https://procurelex.hu/en/guides/espd-and-proof).

A business secret may also be placed, separately, in what is supplied or clarified ([Kbt. Section 44(1)](https://procurelex.hu/en/kbt/44#p1)); if a designation as business secret does not comply with the Act, the contracting authority must ask the economic operator, through a request for missing documents, for a compliant document ([Kbt. Section 44(4)](https://procurelex.hu/en/kbt/44#p4)).

## In practice

- For contracting authorities: it is good practice to list the deficiencies precisely, document by document; a deficiency once indicated cannot be remedied later, and one not indicated calls for a further request ([Kbt. Section 71(6)](https://procurelex.hu/en/kbt/71#p6)).
- For tenderers: while the time limit runs, it is worth reviewing the whole tender, because voluntary remedy is then also open ([Kbt. Section 71(5)](https://procurelex.hu/en/kbt/71#p5)).
- The evaluation also includes, where needed, the request for justification under Section 72 ([Kbt. Section 69(2)](https://procurelex.hu/en/kbt/69#p2)); see the [guide on abnormally low tenders](https://procurelex.hu/en/guides/abnormally-low-tenders). A tenderer that considers a request or a declaration of invalidity unlawful may start pre-litigation dispute resolution within three working days of learning of it ([Kbt. Section 80(1)(a)](https://procurelex.hu/en/kbt/80#p1-a); see the [guide on remedies](https://procurelex.hu/en/guides/remedies-public-procurement-arbitration-board)).